<?xml version="1.0" encoding="utf-8" standalone="yes"?><?xml-stylesheet href="/feed_style.xsl" type="text/xsl"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="https://www.rssboard.org/media-rss">
  <channel>
    <title>ToDo on Eva Winterschon</title>
    <link>https://winterschon.gitlab.io/tags/todo/</link>
    <description>Recent content in ToDo on Eva Winterschon</description>
    <generator>Hugo -- gohugo.io</generator>
    <language>en</language>
    <copyright>Some copyright notice - [my license](https://example.com/license)</copyright>
    <lastBuildDate>Sun, 31 Aug 2025 15:08:18 +0000</lastBuildDate><atom:link href="https://winterschon.gitlab.io/tags/todo/index.xml" rel="self" type="application/rss+xml" /><icon>https://winterschon.gitlab.io/logo.svg</icon>
    
    
    <item>
      <title>Sunday Homelab TPM OMGOSH</title>
      <link>https://winterschon.gitlab.io/en/posts/sunday-homelab-tpm-omgosh/</link>
      <pubDate>Sun, 31 Aug 2025 15:08:18 +0000</pubDate>
      
      <guid>https://winterschon.gitlab.io/en/posts/sunday-homelab-tpm-omgosh/</guid>
      <description><![CDATA[<p>It&rsquo;s 0721 on a Sunday morning. I&rsquo;m laying on the couch, pondering the facts of existence, still dealing with C19 Nimbus side effects, and going through a mental checklist for #HomeLab tasks which need attention.</p>
<p>During standard weekends, when not afflicted with the covids, all of the following tasks could be completed in a relaxing and reasonable pace. Perhaps two or three.. time will tell. 😌</p>
<ol>
<li>Remove all ephemeral hardware from 25U rack #2</li>
<li>Swap out 4U APC 3kVA UPS for 2U APC 1.5kVA, in 25U rack #2</li>
<li>Move ARM64 cluster from 12U rack to 25U rack #2</li>
<li>Swap 1x APC PDU (metered only) for APC PDU (switched), in 25U rack #1</li>
<li>Validate LACP map on EX3300-48T, rack #2</li>
<li>Validate 40mm fan situation on EX3300-48T, rack #2</li>
<li>Recable 3x 24 port patch panels, rack #2</li>
<li>Deploy 1x 24 port patch panels, rack #1</li>
<li>Replace all fans in 2U net-infra SmartOS node</li>
<li>Finish firmware updates on all APC devices</li>
<li>Upgrade firmware on all managed switches</li>
<li>Validate 5GbE SFP+/BASET optic for FTTH on X710 NIC</li>
<li>Install 3x SM863 SSD boot drives for Talos II Power9</li>
<li>Install 3x 883DCT SSD storage drives for Talos II Power9</li>
<li>Swap 2x10G Intel X550 for 4x25G QL41234 in Talos II</li>
<li>Swap 2x 120mm &amp; add 1x 92mm fans in Talos II</li>
<li>Ident 1000W PSU for EPYC box, needs PMbus</li>
<li>ooooh there&rsquo;s so much more&hellip;</li>
</ol>
<p><img src="/content/images/2025/08/MessyHomeLab-SunnyCA_2025-08-31_07-43-28_1.png" alt=""></p>
<p>rack consolidation strongly needed</p>
<p>Ehrlich gesagt, just look at this mess, and it&rsquo;s on carpet? Even with solid 14 gauge copper grounding straps on every UPS, PDU, ATS, along with GFCI + AFCI isolation breakers, I cannot in good conscience recommend such blasphemy of electrical code compliance concerns.</p>
<p>So, add this to the list: find some manner of solid platform with a grounding-strap for the two 25U racks <em>(12U needs to be elsewhere, byeeeee).</em></p>
]]></description>
      
    </item>
    
    
  </channel>
</rss>
